KPMG Watford Modernisation

CASE STUDY

About

PROJECT Overview

Comprehensive Passenger and Goods Lift Modernisation as Part of a Major Office Refurbishment Programme

KPMG's Watford office under went a significant refurbishment programme as part of a wider building redevelopment managed by FI Management as the principal contractor. As part of the overall upgrade strategy, Acute Elevators were appointed to modernise the building's triplex passenger lift group together with a separate goods lift, delivering substantial improvements in reliability, performance, aesthetics, and long-term maintainability.

The project formed an important part of the wider office refurbishment, with the objective of providing modern, reliable lift systems that complemented the upgraded workplace environment whilst extending the operational life of the existing installations.

History

A beautiful place and well located near nature

Location

Wellness hotel in the heart of nature and mountains

Services

We offer a wide range of services in our hotel

History

A beautiful place and well located near nature

Location

Wellness hotel in the heart of nature and mountains

Services

We offer a wide range of services in our hotel

PROJECT SUMMARY

The project involved the complete modernisation of three passenger lifts operating as a triplex group, together with a separate goods lift serving the building.

Passenger Lift Modernisation Works

  • Replacement of all passenger lift controllers with new Kollmorgen MPK4 microprocessor-based control systems.
  • Comprehensive electrical upgrades throughout all passenger lift installations.
  • Installation of bespoke lift car interiors designed to complement the refurbished office environment.
  • Replacement of car door operators.
  • Installation of new Meiller 2-hour fire-rated car and landing door systems.
  • Supply and installation of black stainless-steel door finishes throughout the passenger lift group.
  • Upgrading associated wiring, safety circuits, and control equipment.
  • Full testing, commissioning, and certification.

Goods Lift Modernisation Works

  • Replacement of the existing lift controller.
  • Comprehensive electrical upgrade.
  • Installation of new Bolton Gate car doors.
  • Installation of new Bolton Gate landing doors.
  • Renewal of associated control and safety equipment.
  • Full integration, testing, commissioning, and certification.

The works were carefully coordinated alongside the wider refurbishment programme to ensure successful delivery within the overall construction schedule.

CONTACT US
Completed triplex passenger lift installation within the refurbished KPMG Watford office building.

PROJECT Introduction

The existing lift installations had reached astage where ageing control systems, electrical equipment, and door components were becoming increasingly difficult to maintain. Reliability concerns, obsolete equipment, and the availability of replacement parts were creating ongoing challenges for the client.

In addition, the appearance of the lift interiors no longer reflected the quality expected within a modern commercial office environment. KPMG required a solution that would not only improve reliability and maintainability but also enhance the visual appearance of the lifts as part of the wider office refurbishment programme.

Following a detailed survey, Acute Elevators developed a comprehensive modernisation package designed to upgrade the key mechanical, electrical, and aesthetic elements of the installations whilst avoiding the cost and disruption associated with complete lift replacement.

CONTACT US
Home Lift Control Panel

Challenge

The project presented several technical and logistical challenges:

  • The lift modernisation works formed part of a wider office refurbishment programme involving multiple contractors and trades operating simultaneously throughout the building.
  • Close coordination was required with FI Management and the principal contractor to ensure programme milestones and construction deadlines were achieved.
  • The triplex passenger lift group required extensive mechanical, electrical, and aesthetic upgrades whilst maintaining complete consistency across all three installations.
  • Existing control systems and electrical infrastructure required replacement and integration with modern lift technology.
  • The installation of new Meiller fire-rated door systems required careful coordination with building fire compartmentation requirements.
  • Bespoke lift car interior finishes needed to align with the quality and appearance of the newly refurbished office environment.
  • The goods lift modernisation required integration of new Bolton Gate door systems alongside a complete controller and electrical upgrade.

The successful delivery of the project relied upon detailed planning, technical expertise, and close collaboration between all project stakeholders.

CONTACT US
Home Lift Control Panel

Solution

Acute Elevators developed a comprehensive modernisation programme focused on improving reliability, safety, aesthetics,and long-term serviceability.

Passenger Lift Group

The triplex passenger lift group received:

  • New Kollmorgen MPK4 lift controllers, providing advanced diagnostics, improved reliability, enhanced traffic management, and future-proof service support.
  • Comprehensive electrical upgrades and replacement of critical control system components.
  • New car door operators delivering smoother, quieter, and more reliable door operation.
  • New Meiller 2-hour fire-rated car and landing door systems throughout the installation.
  • Premium black stainless-steel landing entrances and car doors, providing a contemporary architectural finish.
  • Fully refurbished bespoke lift car interiors, including new wall finishes, ceilings, lighting, flooring, operating panels, and decorative elements designed to complement the refurbished office environment.
  • Modern diagnostic functionality to simplify future maintenance and fault finding.
  • Full integration and commissioning of the triplex group control system to optimise passenger traffic flow and operational efficiency.

Goods Lift

The goods lift modernisation included:

  • New lift controller and associated control equipment.
  • Complete electrical upgrade.
  • New Bolton Gate heavy-duty car doors.
  • New Bolton Gate landing doors.
  • Safety system upgrades and compliance improvements.
  • Full testing, commissioning, and certification.

All equipment was selected to maximise reliability, improve maintainability, and ensure long-term availability of spare parts and technical support.

CONTACT US
Home Lift Control Panel

Result

The project was successfully completed in accordance with the overall refurbishment programme and construction schedule.

Key outcomes included:

  • Complete modernisation of the triplex passenger lift group.
  • Installation of new Kollmorgen MPK4 controllers providing improved diagnostics, reliability, and performance.
  • Comprehensive electrical upgrades across all lift installations.
  • New Meiller 2-hour fire-rated car and landing door systems enhancing safety, compliance, and operational reliability.
  • Premium black stainless-steel entrance finishes delivering a contemporary appearance consistent with the wider office refurbishment.
  • Bespoke lift car interiors creating a high-quality passenger experience aligned with KPMG's corporate standards.
  • Improved ride quality, door performance, and passenger comfort.
  • Full modernisation of the goods lift including new Bolton Gate car and landing doors.
  • Enhanced maintainability through the use of current-generation lift technology.
  • Improved operational reliability and reduced future maintenance requirements.
  • Full compliance with current lift safety standards and regulations.
  • Successful integration of the lift works within the wider office refurbishment programme.

The completed project has provided KPMG with modern, reliable, and visually impressive lift systems that complement the refurbished office environment whilst delivering long-term performance, reliability, and value.

ProjectDetails

Client: KPMG

Location: Watford, Hertfordshire

Sector: Commercial Office

Project Type: Lift Modernisation & Refurbishment

Passenger Lift Works

  • Triplex Passenger Lift Group Modernisation
  • New Kollmorgen MPK4 Controllers
  • Comprehensive Electrical Upgrades
  • Bespoke Lift Car Interior Refurbishment
  • New Car Door Operators
  • Meiller 2-Hour Fire-Rated Car Doors
  • Meiller 2-Hour Fire-Rated Landing Doors
  • Black Stainless-Steel Entrance Finishes

Goods Lift Works

  • New Lift Controller
  • Electrical Upgrade
  • New Bolton Gate Car Doors
  • New Bolton Gate Landing Doors

Project Coordination: FI Management

Delivered By: Acute New Elevators Ltd

KeyBenefits Delivered

✓ Improved Reliability

✓ Enhanced Passenger Experience

✓ Fire-Rated Door Compliance

✓ Modern Bespoke Interiors

✓ Future-Proof Control Technology

✓ Reduced Maintenance Requirements

✓ Extended Asset Life

✓ Premium Architectural Finish